Get a quote

Home / Solutions / Factories & Logistics / Industrial park shared parking, 500 spaces

Design case · 3D concept rendering

Industrial park shared parking, 500 spaces

Design case for factories & logistics in South Asia: T-Frame (Double Cantilever) structure, 1.16 MWp.

Industrial park shared parking, 500 spaces – 3D concept rendering
500parking spaces
1.16 MWpPV capacity
1,740 MWhestimated per year
16 wktypical installation

Design case: a typical configuration built from common project parameters. Images are 3D concept renderings, not photographs of a completed project.

The project

Site, challenge and layout

The site

A shared car park in a multi-tenant industrial park, used by workers from several factories. The park operator sells power to the tenants.

Design challenge

The site lies in a cyclone zone, with design wind speeds around 44 m/s, and the soil is soft clay near the surface.

Layout

T-frame rows with heavier columns and closer column spacing (5 m) reduce the load on each foundation. Bored piers reach firmer soil, and the roof tilt is kept low to reduce wind uplift.

Configuration

System details

ApplicationFactories & Logistics
Region (typical)South Asia
StructureT-Frame (Double Cantilever)
MaterialHot-dip galvanized steel Q355
PV modules2,000 × 580 W
System size1.16 MWp (about 2.3 kWp per space)
Estimated yield1,740 MWh per year at about 1,500 kWh/kWp
Design wind44 m/s (cyclone zone)
Snow loadnone
ExtrasCyclone-rated foundations
On-site installationabout 16 weeks for an experienced crew

Typical quantities

Bill of materials estimate

Rough quantities for a project like this, to help with budgeting and logistics. Final figures come from the structural design.

Structure weightabout 52.2 t of steel (45 kg/kWp)
Foundationsabout 125 pads or piers
PV modules2,000 pcs, about 4 × 40HQ containers
Structure shippingabout 3 × 40HQ containers
Installation crew4–6 installers with a small crane

Design notes

Why this layout

The car park is laid out in double rows, so a T-frame covers two rows from one column line and keeps the aisles free.

Yield is estimated from typical irradiation for the region and a performance ratio of about 80%. For your project we calculate it with your exact location, tilt and orientation.

Planning something similar? Send us your site and number of spaces, and we will prepare a layout like this one. See also T-Frame (Double Cantilever) and other industrial cases.

Get a quote

Tell us about your car park

Send the number of spaces and the site location. We reply with a layout, structure proposal and price, usually within one working day.